Mining

Bitcoin network, as of

Abu Dhabi licenses bitcoin mining as a business

ADGM licenses mining as a commercial activity, not a financial service.

Network hashrate1,051 EH/severy miner in the world, added up
Next difficulty change+9.1%due 27 Nov, in 109 blocks
HashpriceAED 101a day for each PH/s of machines
Blocks to the halving72,349then the reward halves, about April 2028
Miners

Four large miners work from the UAE

By the hashrate each states. One publishes none, so it is shown by bitcoin held.

Government-linked

Citadel Mining

Mines on Al Reem Island, Abu Dhabi, since 2022.

6,997 BTCon wallets Arkham links to it, 5 Aug 2026: an on-chain estimate (Arkham via Bitcoin.com)
9,300 BTCmined in all by Aug 2025, Arkham’s estimate

Who owns it

  1. UAE Royal Group
  2. 61%
  3. IHCInternational Holding Company
  4. owns
  5. 2PointZero
  6. 85%
  7. Citadel Mining

Phoenix Group’s accounts carry a stake in Citadel Technologies Group LLC worth USD 24 million on 30 Sep 2026.

CompanyIn the UAEHashrateBitcoin
Phoenix GroupListed in Abu Dhabi (ADX: PHX)13 EH/sQ2 2026, group-wide331 BTC held30 Sep 2026, its accounts
NIP GroupAbu Dhabi-based11.3 EH/sNov 2025about 160 BTC a monthits own estimate
Zero Two and MARAMasdar City and Mina Zayed, 250 MW7 EH/splanned, 2023not published
Citadel MiningAl Reem Island, Abu Dhabinot publishedabout 6,997 BTC held5 Aug 2026, Arkham estimate

Hashrates are what each firm states, group-wide where it has sites abroad.

Services

Two ways to mine without your own site

Cloud mining rents you hashrate. Hosting runs a machine you own. Listed A to Z from each firm’s own pages.

Cloud mining rent hashrate without owning a machine

  • BitFuFuSingapore · Nasdaq: FUFU

    Cloud mining and hosting at its own sites. Cloud mining was 79% of its revenue in Q1 2026.

    UAE licence: None foundBitFuFu’s Q1 2026 results, 29 May 2026

  • du Cloud MinerUAE

    Bitcoin hashrate by subscription: 24-month contracts of 250 TH/s, mined in du Tech’s UAE data centres. UAE residents only; sold by auction in Nov 2025.

    UAE licence: None nameddu’s launch release, 2 Nov 2025

  • GoMiningCyprus and the BVI

    “Digital miners”: shares of mining power sold in TH/s, run in data centres in the US, Africa and Central Asia, its site says.

    UAE licence: None foundGoMining’s terms, as of 19 Nov 2026

Facts, not offers: no returns are shown. Licences checked against the VARA, FSRA and DFSA lists of 17 Nov 2026. Rates are each firm’s own.

Calculator

Every machine has a break-even power price

Pick a machine and a power price to see the margin at today’s difficulty.

480 TH/s · 5,280 W · 11 J/TH · list price USD 9,120

fils

The first band for customers above 10,000 MWh a month.

Bitmain Antminer S21 XP+ Hyd. at 32 fils per kWh

EarnsAED 48.42
Power costsAED 40.55
Breaks even at38.2 fils per kWhat today’s difficulty and price; below this the machine earns more than its power costs
Margin a day at this price
AED 7.87
Days to earn back the list price
4,256 days

480 TH/s × AED 100.87 per PH/s = AED 48.42 earned a day. 5,280 W × 24 hours = 126.7 kWh × 32 fils = AED 40.55 for power. 48.42 − 40.55 = AED 7.87.

Not counted: cooling, hosting, pool fees, shipping and repairs. Difficulty and price move every day, so the answer does too. Arithmetic, not advice.

How it works

Four things decide the margin

Two set what a machine earns. Two set what it costs to run.

Earns
Higher: more marginBitcoin priceAED 215,117Up: every block pays more dirhams.
Higher: less marginDifficulty134.82 TUp: the same machine wins a smaller share.
Costs
Lower: more marginEfficiency8.9 to 16.8 J/THLower: less power for the same work.
Higher: less marginPower price26 to 44 filsThe one input you choose, by where you plug in.
MarginWhat is left each day.
Power

Dubai’s top industrial rate is 44 fils

38 fils tariff + 6 fils fuel surcharge (November 2026), before 5% VAT.

  • Dubai, first slabDEWA industrial, 0 to 10,000 kWh a month23 fils
  • Dubai, above itDEWA industrial, above 10,000 kWh a month38 fils
  • Dubai fuel surchargeadded to every kWh, November 2026+6 fils
  • Northern Emirates, large usersEtihadWE, above 10,000 MWh a month26 to 32 fils
3,800 kWh a month for one Bitmain Antminer S21 XP+ Hyd. running all day, so three running together pass Dubai’s first 10,000 kWh slab

In Abu Dhabi or Sharjah, type your own rate into the calculator.

Rules

A commercial licence, not a financial one

What ADGM and VARA say about mining, and what no rule covers yet.

ADGM: a business licence

Since 28 Oct 2026, ADGM’s Registration Authority licenses crypto mining as a commercial activity, code 7230. It is not a regulated financial service.

VARA: an energy disclosure

Its rulebook does not say whether mining alone needs a licence. Firms it licenses that mine, fund mining or sell machines must publish their energy use.

Home mining: no rule

No UAE rule we read covers it. ADGM’s draft guidance puts small, personal mining outside its licensing.

Machines

The most efficient machine on sale uses 11 J/TH

14 machines by the makers’ own figures, most efficient first. Three more, sold for later delivery, go down to 8.9 J/TH. Fewer joules per terahash is better.

  1. 1Bitmain Antminer S23 XP Hyd.hydro-cooled, futures8.9J/TH600TH/s5,340WUSD 15,300
  2. 2Bitdeer SEALMINER A4 Ultra Hydrohydro-cooled, pre-order9.45J/TH886TH/s8,372.7Wno price yet
  3. 3Bitdeer SEALMINER A4 Pro Airair-cooled, pre-order10.9J/TH336TH/s3,662.4Wno price yet
  4. 4Bitmain Antminer S21 XP+ Hyd.hydro-cooled, spot11J/TH480TH/s5,280WUSD 9,120
  5. 5Bitdeer SEALMINER A3 Pro Hydrohydro-cooled, in stock12.5J/TH660TH/s8,250WUSD 9,900
  6. 6Canaan Avalon A16XP-300Tfutures12.8J/TH300TH/s3,850WUSD 4,800
  7. 7Bitdeer SEALMINER A3 Hydrohydro-cooled, in stock13.5J/TH500TH/s6,750WUSD 6,750
  8. 8Bitmain Antminer S21 XP Imm.immersion-cooled, spot13.5J/TH300TH/s4,050WUSD 2,400
  9. 9Bitmain Antminer S21 XPair-cooled, spot13.5J/TH270TH/s3,645WUSD 4,590
  10. 10MicroBT WhatsMiner M70Sspot13.5J/TH248TH/s3,348WUSD 3,472
  11. 11Canaan Avalon A16-282Tfutures13.8J/TH282TH/s3,900WUSD 3,666
  12. 12MicroBT WhatsMiner M73spot14.5J/TH512TH/s7,424WUSD 6,144
  13. 13MicroBT WhatsMiner M70spot14.5J/TH220TH/s3,190WUSD 2,640
  14. 14Canaan Avalon A15Pro-221Tspot16.8J/TH221TH/s3,662WUSD 1,944.8

Questions

Questions people ask

In ADGM, Abu Dhabi, yes: since 28 Oct 2026 its Registration Authority has licensed crypto mining as a commercial activity, not a financial service.

No Dubai rule we read answers it. VARA’s Company Rulebook does not say that mining alone needs a licence; it tells firms VARA already licenses to publish their energy use if they mine, fund mining or sell machines.

How much does electricity cost for bitcoin mining in the UAE?

DEWA charges industrial users in Dubai 23 fils per kWh for the first 10,000 kWh a month and 38 fils above that, plus a 6 fils fuel surcharge (November 2026) and 5% VAT. EtihadWE quotes 26 to 32 fils to its largest customers in the Northern Emirates.

Is bitcoin mining profitable in the UAE?

It turns on the power price. As of 26 Nov 2026, the most efficient machine on sale (11 J/TH) breaks even at about 38.2 fils per kWh; Dubai’s industrial rates with the surcharge are 29 and 44 fils. Run the sum for any machine and price.

Can I mine bitcoin at home in the UAE?

No rule we read covers home mining in Dubai or elsewhere in the UAE. In ADGM, the consultation draft says small-scale mining by individuals for personal use is generally outside its licensing.

What is the fine for mining crypto on a farm in Abu Dhabi?

AED 100,000, doubled for a repeat offence. The farm’s power is cut, its services suspended and the machines confiscated; the ban covers owners and tenants.

Who mines bitcoin in the UAE?

Three companies state a hashrate: Phoenix Group (13 EH/s), NIP Group (11.3 EH/s) and Zero Two and MARA (7 EH/s planned). The first two report group-wide figures, not UAE-only ones. Citadel Mining, on Al Reem Island, publishes no hashrate.

Does the UAE government mine bitcoin?

Arkham Intelligence labels Citadel Mining’s wallets as UAE government holdings. Citadel is 85% held by 2PointZero, part of IHC, in which UAE Royal Group holds 61%. Arkham links about 6,997 BTC to it (5 Aug 2026) and estimates it had mined about 9,300 BTC by Aug 2025.

What is cloud mining?

Renting mining power from a firm that owns and runs the machines. You pay for hashrate for a set term and receive a share of what it mines, less the firm’s fees. Services lists what each is and where it is based.

When is the next bitcoin halving?

At block 1,050,000, about April 2028. The reward for a block falls from 3.125 to 1.5625 BTC, so the same machine earns about half as much bitcoin.