Bitcoin network, as of
Abu Dhabi licenses bitcoin mining as a business
ADGM licenses mining as a commercial activity, not a financial service.
Four large miners work from the UAE
By the hashrate each states. One publishes none, so it is shown by bitcoin held.
Government-linked
Citadel Mining
Mines on Al Reem Island, Abu Dhabi, since 2022.
Who owns it
- UAE Royal Group
- 61%
- IHCInternational Holding Company
- owns
- 2PointZero
- 85%
- Citadel Mining
Phoenix Group’s accounts carry a stake in Citadel Technologies Group LLC worth USD 24 million on 30 Sep 2026.
| Company | In the UAE | Hashrate | Bitcoin |
|---|---|---|---|
| Listed in Abu Dhabi (ADX: PHX) | 13 EH/sQ2 2026, group-wide | 331 BTC held30 Sep 2026, its accounts | |
| Abu Dhabi-based | 11.3 EH/sNov 2025 | about 160 BTC a monthits own estimate | |
| Zero Two and MARA | Masdar City and Mina Zayed, 250 MW | 7 EH/splanned, 2023 | not published |
| Citadel Mining | Al Reem Island, Abu Dhabi | not published | about 6,997 BTC held5 Aug 2026, Arkham estimate |
Hashrates are what each firm states, group-wide where it has sites abroad.
Two ways to mine without your own site
Cloud mining rents you hashrate. Hosting runs a machine you own. Listed A to Z from each firm’s own pages.
Cloud mining rent hashrate without owning a machine
BitFuFuSingapore · Nasdaq: FUFUCloud mining and hosting at its own sites. Cloud mining was 79% of its revenue in Q1 2026.
UAE licence: None foundBitFuFu’s Q1 2026 results, 29 May 2026
- du Cloud MinerUAE
Bitcoin hashrate by subscription: 24-month contracts of 250 TH/s, mined in du Tech’s UAE data centres. UAE residents only; sold by auction in Nov 2025.
UAE licence: None nameddu’s launch release, 2 Nov 2025
GoMiningCyprus and the BVI“Digital miners”: shares of mining power sold in TH/s, run in data centres in the US, Africa and Central Asia, its site says.
UAE licence: None foundGoMining’s terms, as of 19 Nov 2026
Hosting in the UAE your machine, their power
CiphertechAbu Dhabi · 30 MW · air and hydro cooling · No licence named23.9 to 27.5 filsper kWh, by plan
OneMinersDubai and Abu Dhabi · 34 MW · air and hydro cooling · No licence named16.9 to 26.8 filsper kWh, by plan
Segments10 centres in the UAE · 20.7 MW · 3 hydro, 5 air, 2 both cooling · Licence no. 4701512923.9 to 25 filsper kWh, by plan
Facts, not offers: no returns are shown. Licences checked against the VARA, FSRA and DFSA lists of 17 Nov 2026. Rates are each firm’s own.
Every machine has a break-even power price
Pick a machine and a power price to see the margin at today’s difficulty.
Bitmain Antminer S21 XP+ Hyd. at 32 fils per kWh
- Margin a day at this price
- AED 7.87
- Days to earn back the list price
- 4,256 days
480 TH/s × AED 100.87 per PH/s = AED 48.42 earned a day. 5,280 W × 24 hours = 126.7 kWh × 32 fils = AED 40.55 for power. 48.42 − 40.55 = AED 7.87.
Not counted: cooling, hosting, pool fees, shipping and repairs. Difficulty and price move every day, so the answer does too. Arithmetic, not advice.
Four things decide the margin
Two set what a machine earns. Two set what it costs to run.
Dubai’s top industrial rate is 44 fils
38 fils tariff + 6 fils fuel surcharge (November 2026), before 5% VAT.
- Dubai, first slabDEWA industrial, 0 to 10,000 kWh a month23 fils
- Dubai, above itDEWA industrial, above 10,000 kWh a month38 fils
- Dubai fuel surchargeadded to every kWh, November 2026+6 fils
- Northern Emirates, large usersEtihadWE, above 10,000 MWh a month26 to 32 fils
In Abu Dhabi or Sharjah, type your own rate into the calculator.
A commercial licence, not a financial one
What ADGM and VARA say about mining, and what no rule covers yet.
ADGM: a business licence
Since 28 Oct 2026, ADGM’s Registration Authority licenses crypto mining as a commercial activity, code 7230. It is not a regulated financial service.
VARA: an energy disclosure
Its rulebook does not say whether mining alone needs a licence. Firms it licenses that mine, fund mining or sell machines must publish their energy use.
Home mining: no rule
No UAE rule we read covers it. ADGM’s draft guidance puts small, personal mining outside its licensing.
Three pools found 62% of last week’s blocks
The 10 largest mining pools, by blocks found in the last week, as of .
- 1Foundry USA249 blocks22.7%of blocks
- 2
AntPool247 blocks22.6%of blocks - 3
F2Pool183 blocks16.7%of blocks - 4
ViaBTC92 blocks8.4%of blocks - 5
SpiderPool82 blocks7.5%of blocks - 6Luxor66 blocks6%of blocks
- 7
MARA Pool60 blocks5.5%of blocks - 8
SECPOOL43 blocks3.9%of blocks - 9OCEAN35 blocks3.2%of blocks
- 10
Braiins Pool14 blocks1.3%of blocks
The most efficient machine on sale uses 11 J/TH
14 machines by the makers’ own figures, most efficient first. Three more, sold for later delivery, go down to 8.9 J/TH. Fewer joules per terahash is better.
- 1Bitmain Antminer S23 XP Hyd.hydro-cooled, futures8.9J/TH600TH/s5,340WUSD 15,300
- 2Bitdeer SEALMINER A4 Ultra Hydrohydro-cooled, pre-order9.45J/TH886TH/s8,372.7Wno price yet
- 3Bitdeer SEALMINER A4 Pro Airair-cooled, pre-order10.9J/TH336TH/s3,662.4Wno price yet
- 4Bitmain Antminer S21 XP+ Hyd.hydro-cooled, spot11J/TH480TH/s5,280WUSD 9,120
- 5Bitdeer SEALMINER A3 Pro Hydrohydro-cooled, in stock12.5J/TH660TH/s8,250WUSD 9,900
- 6Canaan Avalon A16XP-300Tfutures12.8J/TH300TH/s3,850WUSD 4,800
- 7Bitdeer SEALMINER A3 Hydrohydro-cooled, in stock13.5J/TH500TH/s6,750WUSD 6,750
- 8Bitmain Antminer S21 XP Imm.immersion-cooled, spot13.5J/TH300TH/s4,050WUSD 2,400
- 9Bitmain Antminer S21 XPair-cooled, spot13.5J/TH270TH/s3,645WUSD 4,590
- 10MicroBT WhatsMiner M70Sspot13.5J/TH248TH/s3,348WUSD 3,472
- 11Canaan Avalon A16-282Tfutures13.8J/TH282TH/s3,900WUSD 3,666
- 12MicroBT WhatsMiner M73spot14.5J/TH512TH/s7,424WUSD 6,144
- 13MicroBT WhatsMiner M70spot14.5J/TH220TH/s3,190WUSD 2,640
- 14Canaan Avalon A15Pro-221Tspot16.8J/TH221TH/s3,662WUSD 1,944.8
Questions people ask
Is crypto mining legal in the UAE?
In ADGM, Abu Dhabi, yes: since 28 Oct 2026 its Registration Authority has licensed crypto mining as a commercial activity, not a financial service.
Is crypto mining legal in Dubai?
No Dubai rule we read answers it. VARA’s Company Rulebook does not say that mining alone needs a licence; it tells firms VARA already licenses to publish their energy use if they mine, fund mining or sell machines.
How much does electricity cost for bitcoin mining in the UAE?
DEWA charges industrial users in Dubai 23 fils per kWh for the first 10,000 kWh a month and 38 fils above that, plus a 6 fils fuel surcharge (November 2026) and 5% VAT. EtihadWE quotes 26 to 32 fils to its largest customers in the Northern Emirates.
Is bitcoin mining profitable in the UAE?
It turns on the power price. As of 26 Nov 2026, the most efficient machine on sale (11 J/TH) breaks even at about 38.2 fils per kWh; Dubai’s industrial rates with the surcharge are 29 and 44 fils. Run the sum for any machine and price.
Can I mine bitcoin at home in the UAE?
No rule we read covers home mining in Dubai or elsewhere in the UAE. In ADGM, the consultation draft says small-scale mining by individuals for personal use is generally outside its licensing.
What is the fine for mining crypto on a farm in Abu Dhabi?
AED 100,000, doubled for a repeat offence. The farm’s power is cut, its services suspended and the machines confiscated; the ban covers owners and tenants.
Who mines bitcoin in the UAE?
Three companies state a hashrate: Phoenix Group (13 EH/s), NIP Group (11.3 EH/s) and Zero Two and MARA (7 EH/s planned). The first two report group-wide figures, not UAE-only ones. Citadel Mining, on Al Reem Island, publishes no hashrate.
Does the UAE government mine bitcoin?
Arkham Intelligence labels Citadel Mining’s wallets as UAE government holdings. Citadel is 85% held by 2PointZero, part of IHC, in which UAE Royal Group holds 61%. Arkham links about 6,997 BTC to it (5 Aug 2026) and estimates it had mined about 9,300 BTC by Aug 2025.
What is cloud mining?
Renting mining power from a firm that owns and runs the machines. You pay for hashrate for a set term and receive a share of what it mines, less the firm’s fees. Services lists what each is and where it is based.
When is the next bitcoin halving?
At block 1,050,000, about April 2028. The reward for a block falls from 3.125 to 1.5625 BTC, so the same machine earns about half as much bitcoin.
Sources and method.
Network figures (hashrate 1,051 EH/s, difficulty 134,823,837,323,273, next change +9.08% expected 27 Nov 2026, block height 977,651, subsidy 3.125 BTC, average fees 0.0176 BTC a block over the last 144 blocks, 72,349 blocks to the halving at block 1,050,000, next-block fee 2 sat/vB) are from mempool.space, read 2026-11-26 08:34:38 UTC. The page replaces them with a live reading from the same source when one arrives.
Hashprice (AED 100.87 per PH/s a day) is our sum: 86,400 seconds of 1 PH/s, divided by difficulty × 2^32, times subsidy plus average fees (3.1426 BTC), times the bitcoin price (USD 58,575, data/price.json (Binance), as of 25 Nov 2026), times the 3.6725 dirham peg. The halving date is blocks left times ten minutes.
ADGM Registration Authority, Guidance on Crypto Mining Activities in and from ADGM (28 Oct 2026): Crypto mining is a licensable commercial activity overseen by the Registration Authority, not a regulated financial service. It has its own commercial licence, business activity code 7230. The guidance is issued under section 23 of the Commercial Licensing Regulations 2025. A fuller framework is to be consulted on later. Approval from the financial regulator (FSRA) is not required for mining itself; a commercial licence from the Registration Authority is. As of 18 Nov 2026 at the source.
ADGM Registration Authority, Proposed guidance attached to Discussion Paper No. 1 of 2026 (the consultation draft) (28 Jan 2026): The draft says small-scale, non-commercial mining by individuals for personal purposes is generally outside the guidance and its licensing requirements. This is the consultation draft; the final text of 28 October 2026 was not read in full. Not stated. As of 18 Nov 2026 at the source.
VARA (Virtual Assets Regulatory Authority), Company Rulebook, Part V, section F: Virtual Asset mining and data-intensive activities (19 May 2025): Licensed firms that invest in mining or staking businesses, or conduct or facilitate mining or staking, including by selling equipment, must publish on their website their use of renewable or waste energy and their decarbonisation steps. Not stated: the rulebook read sets a disclosure duty on firms VARA already licenses; it does not say whether mining alone needs a VARA licence. As of 18 Nov 2026 at the source.
Abu Dhabi Agriculture and Food Safety Authority (ADAFSA), Ban on cryptocurrency mining on farms (30 Sep 2025): Mining on agricultural land is banned. The fine is AED 100,000, doubled for a repeat offence, with the farm's electricity cut, its services suspended and the machines confiscated. It applies to owners and tenants. Not applicable. As of 18 Nov 2026 at the source.
Phoenix Group PLC: Listed in Abu Dhabi; the UAE is one of five regions it names for its capacity. Hashrate 13 EH/s (average over Q2 2026 across mining, hosting and joint ventures, group-wide; 30 Jun 2026). Capacity: over 550 MW across the UAE, Oman, North America, East Africa and Europe; no figure for the UAE alone. UAE sites: not stated. Bitcoin held: 331 BTC (its interim financial statements to 30 Sep 2026, note 8 (304 of the 331 BTC pledged as collateral); 30 Sep 2026). Holds an interest in Citadel Technologies Group LLC, carried as an associate at USD 24.0 million on 30 Sep 2026; dividends received from Citadel USD 7.2 million in the nine months (interim statements, note 6). As of 18 Nov 2026 at source 1, source 2, source 3.
NIP Group Inc.: Described as Abu Dhabi-based. Hashrate 11.3 EH/s (as reported by Gulf News; the company calls itself the largest publicly listed bitcoin miner in the Middle East and North Africa; 3 Nov 2025). Capacity: not stated. UAE sites: not stated: the source does not say where its machines are. As of 18 Nov 2026 at source 1.
Zero Two and MARA (Abu Dhabi joint venture): Two sites in Abu Dhabi: Masdar City (200 MW) and Mina Zayed (50 MW). Hashrate 7 EH/s (about 7 EH/s expected from both sites when announced; 9 May 2023). Capacity: 250 MW planned across the two sites, immersion-cooled; Zero Two 80%, MARA 20%. UAE sites: Masdar City, Abu Dhabi, 200 MW; Mina Zayed, Abu Dhabi, 50 MW (as announced on 9 May 2023; current output not stated). As of 18 Nov 2026 at source 1.
Citadel Mining: Mines on Al Reem Island, Abu Dhabi, since 2022. Hashrate: not published. Capacity: not published. UAE sites: Al Reem Island, Abu Dhabi; built in 2022 with Phoenix Group and IHC (Cointelegraph, Bitcoin.com). Bitcoin held: 6,997 BTC (about 6,997 BTC on 37 addresses Arkham Intelligence links to Citadel Mining, as reported by Bitcoin.com on 5 Aug 2026; an on-chain estimate, not a company figure; 5 Aug 2026). Ownership: 85% held by 2PointZero, which is owned by International Holding Company (IHC); UAE Royal Group holds 61% of IHC (Cointelegraph, 26 Aug 2025, citing Arkham Intelligence). Mined in all: about 9,300 BTC mined in all, Arkham's estimate as reported by Cointelegraph on 26 Aug 2025. Rate: 4.2 BTC a day over the seven days before 19 Feb 2026, Arkham data as reported by The Block. As of 19 Nov 2026 at source 1, source 2, source 3, source 4.
Pools: share of the 1,095 blocks found in the last week, from mempool.space, read 2026-11-26 08:34:38 UTC. 1. Foundry USA 22.74% (249 blocks). 2. AntPool 22.56% (247 blocks). 3. F2Pool 16.71% (183 blocks). 4. ViaBTC 8.4% (92 blocks). 5. SpiderPool 7.49% (82 blocks). 6. Luxor 6.03% (66 blocks). 7. MARA Pool 5.48% (60 blocks). 8. SECPOOL 3.93% (43 blocks). 9. OCEAN 3.2% (35 blocks). 10. Braiins Pool 1.28% (14 blocks).
Machines: hashrate, power, efficiency and list price are each maker’s own shop listing, as of 26 Nov 2026: Bitmain, Bitdeer, Canaan, MicroBT. MicroBT lists no wattage, so its power figures are hashrate times efficiency. UAE offices or distributors of the makers: not stated.
Electricity: DEWA industrial, 0 to 10,000 kWh a month: 23 fils per kWh (source, as of 18 Nov 2026). DEWA industrial, above 10,000 kWh a month: 38 fils per kWh (source, as of 18 Nov 2026). DEWA residential and commercial, 0 to 2,000 kWh a month: 23 fils per kWh (source, as of 18 Nov 2026). DEWA residential and commercial, 2,001 to 4,000 kWh a month: 28 fils per kWh (source, as of 18 Nov 2026). DEWA residential and commercial, 4,001 to 6,000 kWh a month: 32 fils per kWh (source, as of 18 Nov 2026). DEWA residential and commercial, above 6,000 kWh a month: 38 fils per kWh (source, as of 18 Nov 2026). DEWA fuel surcharge, added to every kwh, November 2026: 6 fils per kWh (source, as of 18 Nov 2026). EtihadWE large industrial and technology customers, above 10,000 MWh a month: 26 to 32 fils per kWh (source, as of 23 Jun 2024). As of 26 Nov 2026.
Calculator prices: Dubai, DEWA industrial above 10,000 kWh: 44 fils (38 fils tariff + 6 fils fuel surcharge (November 2026), before 5% VAT). Dubai, DEWA first 10,000 kWh: 29 fils (23 fils tariff + 6 fils fuel surcharge (November 2026), before 5% VAT). Northern Emirates, EtihadWE large customers, top band: 32 fils (the first band for customers above 10,000 MWh a month). Northern Emirates, EtihadWE large customers, lowest band: 26 fils (the lowest band for customers above 10,000 MWh a month).
Hosting, Ciphertech: Abu Dhabi (office) and Al Ain (warehouse, Al Noud, Wadi Al Ain); 30 MW (the page says 'up to 30+' MW of ready power); Premium, 150 machines or more US$0.065 per kWh; Pro, 5 to 150 machines US$0.075 per kWh, shown in fils at the 3.6725 peg. Minimum 5 machines. A banner also says hosting from '4 cents per KW' without terms; the plan prices are stored. UAE legal entity: Ciphertech Cloud Computing LLC, written in capitals in the page footer. Licence: none named on the page; it says it is a registered business. As of 19 Nov 2026 at the provider’s page.
Hosting, OneMiners: Dubai and Abu Dhabi (no site address published); 34 MW (stated); 7 years prepaid US$0.046 per kWh; 3 years prepaid US$0.058 per kWh; 1 year prepaid US$0.063 per kWh; machines bought from the provider online US$0.066 per kWh; machines you bring US$0.073 per kWh, shown in fils at the 3.6725 peg. No revenue share. The page states 95%+ uptime on prepaid terms with compensation below it. Minimum order not stated. UAE legal entity: not stated: the page names a US company (CIRCLEHASH LLC, Austin, Texas) as its contact. Licence: none named on the page. As of 18 Nov 2026 at the provider’s page.
Hosting, Segments: 10 centres in the UAE (no addresses published); 20.7 MW (20.7 MW across 10 centres; 13.3 MW of 21 MW contracted in use); hosting, 12-month contract US$0.065 per kWh; full-care hosting, 24-month contract US$0.068 per kWh, shown in fils at the 3.6725 peg. The page states 95.3% uptime across its centres over the last 30 days. Minimum order not stated. UAE legal entity: Segments Cloud Hash FZ-LLC, on the page. Licence: UAE services licence no. 47015129, on its page; the issuing authority is not named. As of 19 Nov 2026 at the provider’s page.
Cloud mining, du Cloud Miner (du (UAE telecom operator), through its du Tech brand): Bitcoin hashrate on a subscription: 24-month contracts of 250 TH/s, run in du Tech data centres in the UAE. Based: UAE. Machines: du Tech data centres in the UAE. Who can join: UAE residents only; identity checked with UAE Pass. Sold: by online auction at onlineauction.ae, 3 to 9 Nov 2025; whether new contracts are on sale now is not stated in the sources read. UAE licence: none named: the launch release speaks of 'regulatory compliance' without naming a regulator or licence. No mining or virtual-asset licence for this firm on the VARA, ADGM FSRA or DFSA lists in data/licences.json (as of 17 Nov 2026). ADGM commercial licences for mining (code 7230) are not on those lists. As of 19 Nov 2026 at source 1, source 2.
Cloud mining, GoMining (GoMining (Cyprus) Limited (app); GoMining (BVI) Limited (token); BMINE (BVI) Limited (digital miners)): 'Digital miners': shares of bitcoin mining power, sold in TH/s, with its own GOMINING token. Based: Cyprus (app operator, reg. HE450955) and the British Virgin Islands. Machines: data centres in the US, Africa and Central Asia, its site says. Who can join: not limited to the UAE in the terms read. Sold: online, in its app. UAE licence: none found; its terms say it does not provide crypto-asset services under financial regulation. No mining or virtual-asset licence for this firm on the VARA, ADGM FSRA or DFSA lists in data/licences.json (as of 17 Nov 2026). ADGM commercial licences for mining (code 7230) are not on those lists. The terms say the product is not an investment product, security or financial instrument. As of 19 Nov 2026 at source 1, source 2.
Cloud mining, BitFuFu (BitFuFu Inc.): Cloud mining for retail and institutional customers, plus hosting at its own sites; cloud mining was 79% of its revenue in Q1 2026. Based: Singapore; listed on Nasdaq (FUFU). Machines: not stated in the release read. Who can join: not stated in the release read. Sold: online. UAE licence: none found. No mining or virtual-asset licence for this firm on the VARA, ADGM FSRA or DFSA lists in data/licences.json (as of 17 Nov 2026). ADGM commercial licences for mining (code 7230) are not on those lists. As of 19 Nov 2026 at source 1.
Not confirmed and left out: Abu Dhabi (ADDC, TAQA Distribution) and Sharjah (SEWA) electricity tariffs: the tariff pages refused or could not be found on 18 Nov 2026, so no rate is stored. EtihadWE standard commercial and industrial slabs: the tariff page did not load; only the large-customer tariff from its 23 June 2024 announcement is stored. Federal position (SCA, Central Bank) on mining: not read; not stated here. VARA: whether mining on its own is a licensed virtual-asset activity is not stated in the Company Rulebook read. Counsel should confirm. Free zones that license mining outside ADGM (for example RAK DAO / Innovation City, DMCC, IFZA): only set-up agents' pages were found, no zone activity list, so none is stored. Zero Two and MARA joint venture: current output and whether both sites run are not stated in the 2023 release read. NIP Group: listing exchange, capacity in MW and site locations are not stated in the source read. Phoenix Group: no UAE-only site list or MW figure in its 2026 releases. Makers' UAE offices or distributors (Bitmain, MicroBT, Canaan, Bitdeer): not confirmed on the makers' own pages. Auradine's site now redirects to another brand and showed no specifications, so it is left out. MicroBT listings give no wattage and no cooling type per model; power is computed from hashrate and efficiency. Hosting: three providers with published UAE rates (OneMiners, Ciphertech, Segments). Phoenix Store and Blockfarms host abroad (Hashrate Index, 2023) and are not listed. Citadel Mining: no company filing or website giving hashrate or capacity was found; 2pointzero.com/companies/citadel returned 404 and Arkham's own report refused automated reading on 19 Nov 2026. Holdings are Arkham's on-chain estimates as reported by Bitcoin.com, The Block and Cointelegraph. Citadel Mining: the 85% (2PointZero) and 61% (Royal Group in IHC) stakes are from Cointelegraph citing Arkham; IHC's January 2024 release put its own stake in 2PointZero at 87%. Phoenix Group's stake percentage in Citadel is not in the Q3 2026 statements read. Zero Two and MARA: reports say the 200 MW Masdar site was inaugurated in October 2023, but MARA's page on it returned 404 on 19 Nov 2026, so the stored figures stay the 2023 plan. Cloud mining: no source read states that cloud-mining contracts are generally unregulated as investments, so the page does not say it. BitFuFu's own site refused automated reading; its Q1 2026 results release was read instead. du Cloud Miner: whether contracts are still on sale after the November 2025 auction is not stated in the sources read.
Dataset: mining.json. This page carries no sponsored spot today; when one is sold it is labelled “Sponsored” here and in the data.